Standard staircase, steel frame+wood plastic floor
Equipment Room
AC and water heater equipment maintenance room
Ceiling
alumium vaneer
Installation Process
Play The Transport
After the external packaging of the product is completed, it is transported using a large flat trailer. During the journey of the product from the factory to the campsite, strict safety protection measures will be taken to ensure safety and stability during transportation.
Product Assembly
After the transportation vehicle arrives at the project site, the customer needs to contact the local crane service on their own. The lifting weight ranges from 6 tons to 10 tons, and it is recommended to use a crane of no less than 25 tons for loading and unloading.
Installed Base
Before installing the product, the customer needs to complete the on-site engineering of water and electricity supply, sewage pipelines, and load-bearing foundation according to our company’s product standard basic water and electricity drawings, Hardened ground can be directly installed on the ground, please prepare infrastructure in advance for other geological environments.
After-sales Service
Our company provides free repair services for our products within one year from the date of custom.er acceptance, if the warranty period exceeds one year, repairs will be charged at cost price.